Visualize event with start and stop time fields

johnansett
Communicator

Hello!

We are trying to determine the best visualization to show scheduling data in Splunk. We have data that provides a Actual Start and Stop and Schedule Start and Stop in epoch time as fields as follows:

2019-09-12 20:52:56.000, MachNo="3", JobSeq="11823", MoldNo="9", PartNo="12202", ShiftSeq="201909130", DeptNo="8", JobID="F13264/3|MFCOV-10   ", JobDesc="F13264/3-PN1200/ 4- 6x 4-M-1400-CE                ", MachID="Cal4  ", MachDesc="Calender 4                                        ", MoldID="CalC                ", MoldDesc="CalC                                              ", NumCavs="1.0", PartID="315274                   ", PartDesc="CONV PN 1200/4 6x4                                ", DeptName="Cal4                ", DeptDesc="Wide Bowl Calender                                ", StartTime="1568321576", StopTime="1568348425", StartTimeHR="2019-09-12 20:52:56.0", StopTimeHR="2019-09-13 04:20:25.0", SchedStart="1568563920", SchedStop="1568572920", SchedQty="2396.0", MiscInfo1="AS SCHED                      ", MiscInfo2="F13264/3-COV                  ", Status="3", StatusDesc="COMP", StatusDescription="Completed job.      ", PctReg="0.0", PcsPerCtn="0.0", PartCost="0.0", MatlCost="0.0", ExpPctUp="100.0", ExpCycTm="2.933", ExpGood="100.0", HistPctUp="100.0", HistCycTm="2.933", HistGood="100.0", MinCycTm="2.0", MaxCycTm="60.702835", SumCycTm="21134.462338209152", SumSqCycTm="438594.73369550705", CycCnt="2200", CycOutSpec="2200", ExpProdQty="1312.8597412109375", CalProdQty="2200.0", PakProdQty="0.0", DefectQty="0.0", TotTime="26857", WtTotTime="26857.0", DownTime="6401", WtDownTime="6401.0", NumDownTm="12", WtNumDownTm="12.0", LaborTime="26857", WtLaborTime="26857.0", Counter2="0", Counter3="0", Counter4="0", MachCost="0.0", LaborCost="0.0", WtCycCnt="2200.0", GroupNo1="13", GroupNo2="255", GroupNo3="255", GroupNo4="255", PartGroupNo1="0", MoldGroupNo1="255", HelpMapId="1", DefectMapId="1", DownMapId="2", SetupCycCnt="0", WtSetupCycCnt="0.0", NonProductionCycCnt="0", WtNonProductionCycCnt="0.0", PartQualCycCnt="0", WtPartQualCycCnt="0.0", ProductionDecimalPlaces="1", ProductionUnits="Meters    ", StockUnits="Rolls     ", MiuMachSpeedUnit="4", TimeDivisor="60.0", IdleQty="0", IdleWtQty="0.0", PmQty="0", PmWtQty="0.0", LinearRateMultiplier="1.0", ScheduledCavs="1.0"

Currently this is visualized in Excel, manually and looks like this:
alt text

We are thinking to do line graphs which are plotted the start and stop vs the sched, but not sure how to plot these fields which have epoch time on a graph.
By the same token think there might be other, better ways to visualize this?

Hope answers can help!!

Thanks guys,

0 Karma
1 Solution

adonio
Ultra Champion
Got questions? Get answers!

Join the Splunk Community Slack to learn, troubleshoot, and make connections with fellow Splunk practitioners in real time!

Meet up IRL or virtually!

Join Splunk User Groups to connect and learn in-person by region or remotely by topic or industry.

Get Updates on the Splunk Community!

Announcing Modern Navigation: A New Era of Splunk User Experience

We are excited to introduce the Modern Navigation feature in the Splunk Platform, available to both cloud and ...

Observability Simplified: Combining User Experience, Application Performance & ...

Tech Talk Observability Simplified: Combining User Experience, Application Performance & Network ...

Event Series May & June: From Network Visibility to Service Intelligence

Unifying the Network: Moving from Alert Noise to Service Intelligence with Splunk ITSI In today’s hybrid ...