Visualize event with start and stop time fields

johnansett
Communicator

Hello!

We are trying to determine the best visualization to show scheduling data in Splunk. We have data that provides a Actual Start and Stop and Schedule Start and Stop in epoch time as fields as follows:

2019-09-12 20:52:56.000, MachNo="3", JobSeq="11823", MoldNo="9", PartNo="12202", ShiftSeq="201909130", DeptNo="8", JobID="F13264/3|MFCOV-10   ", JobDesc="F13264/3-PN1200/ 4- 6x 4-M-1400-CE                ", MachID="Cal4  ", MachDesc="Calender 4                                        ", MoldID="CalC                ", MoldDesc="CalC                                              ", NumCavs="1.0", PartID="315274                   ", PartDesc="CONV PN 1200/4 6x4                                ", DeptName="Cal4                ", DeptDesc="Wide Bowl Calender                                ", StartTime="1568321576", StopTime="1568348425", StartTimeHR="2019-09-12 20:52:56.0", StopTimeHR="2019-09-13 04:20:25.0", SchedStart="1568563920", SchedStop="1568572920", SchedQty="2396.0", MiscInfo1="AS SCHED                      ", MiscInfo2="F13264/3-COV                  ", Status="3", StatusDesc="COMP", StatusDescription="Completed job.      ", PctReg="0.0", PcsPerCtn="0.0", PartCost="0.0", MatlCost="0.0", ExpPctUp="100.0", ExpCycTm="2.933", ExpGood="100.0", HistPctUp="100.0", HistCycTm="2.933", HistGood="100.0", MinCycTm="2.0", MaxCycTm="60.702835", SumCycTm="21134.462338209152", SumSqCycTm="438594.73369550705", CycCnt="2200", CycOutSpec="2200", ExpProdQty="1312.8597412109375", CalProdQty="2200.0", PakProdQty="0.0", DefectQty="0.0", TotTime="26857", WtTotTime="26857.0", DownTime="6401", WtDownTime="6401.0", NumDownTm="12", WtNumDownTm="12.0", LaborTime="26857", WtLaborTime="26857.0", Counter2="0", Counter3="0", Counter4="0", MachCost="0.0", LaborCost="0.0", WtCycCnt="2200.0", GroupNo1="13", GroupNo2="255", GroupNo3="255", GroupNo4="255", PartGroupNo1="0", MoldGroupNo1="255", HelpMapId="1", DefectMapId="1", DownMapId="2", SetupCycCnt="0", WtSetupCycCnt="0.0", NonProductionCycCnt="0", WtNonProductionCycCnt="0.0", PartQualCycCnt="0", WtPartQualCycCnt="0.0", ProductionDecimalPlaces="1", ProductionUnits="Meters    ", StockUnits="Rolls     ", MiuMachSpeedUnit="4", TimeDivisor="60.0", IdleQty="0", IdleWtQty="0.0", PmQty="0", PmWtQty="0.0", LinearRateMultiplier="1.0", ScheduledCavs="1.0"

Currently this is visualized in Excel, manually and looks like this:
alt text

We are thinking to do line graphs which are plotted the start and stop vs the sched, but not sure how to plot these fields which have epoch time on a graph.
By the same token think there might be other, better ways to visualize this?

Hope answers can help!!

Thanks guys,

0 Karma
1 Solution

adonio
Ultra Champion
Get Updates on the Splunk Community!

Building Reliable Asset and Identity Frameworks in Splunk ES

 Accurate asset and identity resolution is the backbone of security operations. Without it, alerts are ...

Cloud Monitoring Console - Unlocking Greater Visibility in SVC Usage Reporting

For Splunk Cloud customers, understanding and optimizing Splunk Virtual Compute (SVC) usage and resource ...

Automatic Discovery Part 3: Practical Use Cases

If you’ve enabled Automatic Discovery in your install of the Splunk Distribution of the OpenTelemetry ...