I have a time chart graph for disk utilization. Requirement is to add a static red color line as a threshold limit at 90% in X axis.. Can some one suggest how can we do that.

Tags (1)
0 Karma

vnravikumar
Champion

Hi @sbhatnagar88

Try this

        <option name="charting.chart.overlayFields">threshold</option>
        <option name="charting.fieldColors">{"threshold":#ff0000}</option>
0 Karma

chrisyounger
SplunkTrust
SplunkTrust

One way you could do it would be to just add | eval threshold = 90 at the

index=_internal| timechart count by log_level | eval threshold = 90

Then go into the chart formatting options > "Chart Overlay" and set the threshold field as an overlay.

Hope this helps!

0 Karma

sbhatnagar88
Path Finder

Hi Chris,

That helped!!..can we also make the color of threshold line RED so that it should be visible easily and different from other lines.

Thanks

0 Karma
Got questions? Get answers!

Join the Splunk Community Slack to learn, troubleshoot, and make connections with fellow Splunk practitioners in real time!

Meet up IRL or virtually!

Join Splunk User Groups to connect and learn in-person by region or remotely by topic or industry.

Get Updates on the Splunk Community!

Break the Build: Inside the KubeDoom Lounge at .conf26

    You step up to the machine. The pixelated corridors of a certain 1993 FPS load in front of you, EMP Pulse ...

Splunk Auto Ingestion Parallel Pipeline Scaling

Why this feature matters Many Splunk environments experience ingestion pressure long before the host is fully ...

Best Practices: Splunk auto adjust pipeline queue

When you enable autoAdjustQueue in Splunk, maxSize should be understood as the queue size Splunk starts with ...