Dashboards & Visualizations

One Month Time Axis

cpmesh
Engager

Is there any way to force the x axis range to be the last one month and to change based on the current date?

I'm looking to plot data for the past month each time the dashboard is opened without having to modify the minimum and maximum fields each time the dashboard is opened.

Tags (2)
1 Solution

sideview
SplunkTrust
SplunkTrust

Absolutely. set the timerange on the search to be

earliest=-1mon latest=now

In the TimeRangePicker you'll see a 'custom time' option. There's a relative time section in that, or the advanced section. You'll be able to enter this in either of those.
Then save your search or report with that time range and that's what you need.

View solution in original post

sideview
SplunkTrust
SplunkTrust

Absolutely. set the timerange on the search to be

earliest=-1mon latest=now

In the TimeRangePicker you'll see a 'custom time' option. There's a relative time section in that, or the advanced section. You'll be able to enter this in either of those.
Then save your search or report with that time range and that's what you need.

Got questions? Get answers!

Join the Splunk Community Slack to learn, troubleshoot, and make connections with fellow Splunk practitioners in real time!

Meet up IRL or virtually!

Join Splunk User Groups to connect and learn in-person by region or remotely by topic or industry.

Get Updates on the Splunk Community!

A Four-Part Event Series: Full Stack Observability For the AI Era

As AI reshapes applications, infrastructure, and the way teams operate, the traditional boundaries of ...

SOC4Kafka - New Kafka Connector Powered by OpenTelemetry

The new SOC4Kafka connector, built on OpenTelemetry, enables the collection of Kafka messages and forwards ...

Event Series: Level up your SOC: Advancing with Splunk Enterprise Security

AI has fundamentally raised the stakes for security operations, and this three-part series is your guide to ...