Dashboards & Visualizations

One Month Time Axis

cpmesh
Engager

Is there any way to force the x axis range to be the last one month and to change based on the current date?

I'm looking to plot data for the past month each time the dashboard is opened without having to modify the minimum and maximum fields each time the dashboard is opened.

Tags (2)
1 Solution

sideview
SplunkTrust
SplunkTrust

Absolutely. set the timerange on the search to be

earliest=-1mon latest=now

In the TimeRangePicker you'll see a 'custom time' option. There's a relative time section in that, or the advanced section. You'll be able to enter this in either of those.
Then save your search or report with that time range and that's what you need.

View solution in original post

sideview
SplunkTrust
SplunkTrust

Absolutely. set the timerange on the search to be

earliest=-1mon latest=now

In the TimeRangePicker you'll see a 'custom time' option. There's a relative time section in that, or the advanced section. You'll be able to enter this in either of those.
Then save your search or report with that time range and that's what you need.

Got questions? Get answers!

Join the Splunk Community Slack to learn, troubleshoot, and make connections with fellow Splunk practitioners in real time!

Meet up IRL or virtually!

Join Splunk User Groups to connect and learn in-person by region or remotely by topic or industry.

Get Updates on the Splunk Community!

Persistent Queue at TcpOut — One of Splunk's Most Practical Features

Splunk introduced persistent queueing at the tcpout layer as one of the most practical resilience features in ...

Skip the Awkward Silence: Have a .conf-ersation at .conf26

Picture this. You arrive at .conf26 already having your socializing and networking plans mapped out. No ...

Rethinking Zero Trust: From Product Purchases to Logical Control Evidence

Implementing Zero Trust (ZT) across complex environments often falters at the very beginning due to a ...