I am charting a range of 30 values (let's call them R) staring around 689511876 ending 690635036. The timechart report gives me a y-axis-min=0 y-axis-max=700,000,000. I want the y-axis min and max t...
...nconsistent between similar searches when only the timeframe is changed.) Sample search (from "Add sparklines to search results"): index=_internal
| chart sparkline count by s...
...ulldown Switcher but it is controlling only one chart which we mention in the layoutpanel option of the module tag. Is there any way I can control multiple charts using a single Pulldown Switcher?
I'm trying to control elipsis behavior in pie chart lables - I need to either control the length of the label or at least make sure that text overflow is set to elipsisEnd.
I've tried s...
I have been asked to help a co-worker create a process controlchart to understand an applications response time.
The following three events are generated for each test.
INFO=Signon_Screen R...
We have a number of charts that show statistics about Servers over time. When you hover over a data point in the chart, a "tooltip" is displayed that shows the time value for the cell, the data v...
Can I have more than 2 time controllers in the 1 dashboard that are independent of each other?
So 1 time controller can control the timeframe on 1 chart and the 2nd time controller can control t...
We have a powershell script which collects all the data/information from all Domain controllers, the data/information is mainly about services (start/stop). The script executes every 2 h...
...ays of the week for week over week comparisons, it would be nice to show the selected day of the week as the major tick label. Is there a charting control variable that can be used for this? thanks i...